Learning Commons
The Learning Commons is a three-story, 45,000-square-foot building that serves as a central hub of academic life on campus, bringing together the resources students use most in one convenient, welcoming space. It also serves as a gathering place where faculty, staff, and employers can easily connect with students, building relationships that support learning and open doors to opportunity.
Step inside and you’ll discover:
- First Floor: A welcoming entry with traditional library resources, a café, and career services, including a dedicated lounge where students and employers can connect.
- Second Floor: An innovative hub with a technology center, makerspace, academic support services, and flexible collaboration areas.
- Third Floor: A quiet retreat featuring university archives, study spaces, an expanded testing center, and a scenic terrace overlooking campus.
Whether students need help with a tough assignment, a place to work on a group project, or tools to prepare for a future career, they can find it all under one roof.
The Learning Commons is about meeting students where they are and giving them what they need to succeed, both on campus and beyond.
Location
1419 Prairie St.
Get Directions
Learning Commons and Library Hours*
Monday–Thursday: 7:30 a.m.–midnight
Friday: 7:30 a.m.–5 p.m.
Saturday: 8 a.m.–5 p.m.
Sunday: 1–10 p.m.
Hours may vary by department. Please refer to department-specific hours below:
Monday–Thursday: 8 a.m.–10 p.m.
Friday and Saturday: 8 a.m.–5 p.m.
Sunday: 1–10 p.m.
Monday–Thursday: 7:30 a.m.–8 p.m.
Friday: 7:30 a.m.–5 p.m.
Saturday and Sunday: Closed
Monday–Friday: 8 a.m.–5 p.m.
Saturday and Sunday: Closed
Monday–Friday: 8 a.m.–5 p.m.
Saturday and Sunday: Closed
Monday–Friday: 7:30 a.m.–5 p.m. (Thursday hours extend to 8 p.m.)
Saturday: 8–11 a.m. on select Saturdays
Sunday: Closed
Monday–Thursday 8 a.m.–8 p.m.
Friday and Saturday: 11 a.m.–4 p.m.
Sunday: Closed
* These hours also apply to the Ammons Study Lounge, James A. Byrd, Sr. and Evelyn Byrd Collaboration Room, Rivera-Mills Zen Den, and the Wheatland Title Company Corporate Lounge.
Timeline
May 1, 2025: A symbolic groundbreaking ceremony was held for the Learning Commons, bringing to life a longstanding vision to build a new, modern library and learning center with the goal to create an academic space that reflects our university’s deep commitment to educational excellence.

May 27, 2025: Construction officially began.
October 24, 2025: The structural steel for the building began to be erected.

November 21, 2025: A topping off ceremony was held to celebrate the placement of the final structural steel beam at the highest point of the building. This construction tradition marks a key milestone: the completion of the structure's frame. As part of the ceremony, President Rivera-Mills, Board of Trustees Chair John Ammons, and State Senator Linda Holmes signed the beam.
April 30, 2026: With the interior structure complete, brick began going up around the exterior of the building.

June 15, 2026: Interior construction continued as walls, mezzanine levels, and key gathering spaces began to take shape throughout the building.

August 1, 2026: Brickwork wrapped up as interior finishes progressed, including paint, tile, ceiling grids, and flooring. Exterior glass neared completion, metal panels were added around the building’s exterior overhang, and site preparation began for upcoming landscaping.

October 30, 2026: Installation of the Water Wall’s base and tile was completed following work that began in August. A gift from the Classes of 1970, 1971, and 1972, the feature fills the atrium with the soothing sounds of cascading water.

November 13, 2026: Students, faculty, staff, elected officials, and community partners gathered for a celebratory ribbon-cutting ceremony.

November 19, 2026: The Learning Commons officially opened its doors.
